Skip to Main Content

Crossing Treatment Procedures

State Laws and Regulations

  • 32-6-191. Responsibility for construction of new or relocated grade crossings

(a) Where a new grade crossing results from the construction of a new or relocated railroad line, the railroad shall be responsible for and bear all expenses of the construction of such grade crossing. The department, when such a grade crossing is on the state highway system, a county, when such a grade crossing is on its county road system, or a municipality, when such a grade crossing is on its municipal street system, may impose such terms and conditions on the nature and manner of construction of such a grade crossing, including the installation of protective devices, as may be necessary for the safe and reasonable passage of public traffic.

(b) Where a new grade crossing results from the construction of a new or relocated public road, the department, when such road is on the state highway system, a county, when such road is on its county road system, or a municipality, when such road is on its municipal street system, shall be responsible for and bear all expenses of the construction of such grade crossing. The railroad may impose such terms and conditions on the nature and manner of construction of such a grade crossing, including the installation of protective devices, as may be reasonably necessary for the safety and convenience of the traveling public. While on the right of way of any railroad during the construction of any such grade crossing, employees or contractors of the department or any county or municipality shall be subject to such rules and regulations of the railroad as may be reasonably necessary for the protection of its traffic, passengers, property, and its safe operation.

(c) Notwithstanding subsection (b) of this Code section, the department, in respect to a grade crossing on the state highway system, a county, in respect to a grade crossing on its county road system, or a municipality, in respect to a grade crossing on its municipal street system, may close and relocate an existing grade crossing by relocation of a part of the public road involved, whenever such closing and relocation is reasonably necessary in the interest of public safety; and the procedure for such closing and relocation and the division of the costs of construction shall be the same as provided in Code Sections 32-6-194 and 32-6-195 for elimination of a grade crossing by construction of an underpass or overpass.

(d) Where there is disagreement as to the terms and conditions imposed on the nature and manner of construction by the department, county, or municipality pursuant to subsection (a) of this Code section or by the railroad pursuant to subsection (b) of this Code section, the department shall make such determination after reasonable opportunity for a hearing is given to all parties concerned.

Ga. Code Ann. § 32-6-191

  • 32-6-194. Procedure for grade crossing elimination

(a) Whenever the department, a county, or a municipality shall decide to eliminate any grade crossing on its respective public road system by means of an underpass or overpass, prompt notice of such decision shall be given to the railroad or railroads involved; and within 30 days thereafter the representatives of the department, the county, or the municipality and of the railroads involved shall meet and, within 90 days, agree to a plan and specifications for the construction of a grade separation structure. Any such agreement between a county or municipality and a railroad shall be submitted to the department for its approval; and work leading to the elimination of the grade crossing pursuant to the agreement shall not commence until and unless the department approves the same. The department, county, or municipality, by agreement with the railroad or railroads involved, may apportion the work to be done in the construction of such grade separation structure between the railroad or railroads and the department or the county or the municipality.

(b) If agreement is not reached within 90 days, the department, county, or municipality may proceed with construction of a grade separation structure or may by written order direct the railroad or railroads involved to proceed with the construction of a grade separation structure according to the plan and specifications accompanying such order, provided that no work shall be begun on any grade separation structure on a county or municipal public road system until and unless the department approves the plan and specifications of such structure. It shall be the duty of said railroad to begin work on any such grade separation structure within four months after receipt of an order to that effect and to complete that structure within a reasonable time, provided that the railroad shall not be required to do the actual physical work of providing approaches by fill to an overpass or the excavating beneath an underpass or the approaches thereto, although the cost of such work shall be considered as part of the costs of the grade crossing elimination, whether actually performed by the railroad, the department, the county, or the municipality; and such costs shall be apportioned as provided in Code Section 32-6-195. If the railroad does not begin work within four months after receipt of an order to that effect, the department, county, or municipality may proceed with the construction of the proposed grade separation structure. If the railroad begins work within four months after receipt of an order to that effect but thereafter fails to complete such work within a reasonable time, the department, county, or municipality may proceed to complete the unfinished work.

(c) In any case where the construction of all or part of a grade separation structure is done by the department, a county, or a municipality, a statement of any railroad’s share of the costs of the project, as determined pursuant to Code Section 32-6-195, plus 8 percent per annum interest on each expenditure of the cost of such project shall be submitted to the railroad upon completion of the project. In the event that the railroad does not make payment or arrange to make payment to the department, county, or municipality within 60 days of receipt of the statement, the department shall certify the amount for collection to the Attorney General; or, in the case of a project on a county or municipal public road system, the county or municipality shall take appropriate action for the collection of the amount thereof. In the event said share is not paid within the time specified in this Code section, said share or any unpaid portion thereof shall bear interest at a rate of 8 percent per annum from the date due.

(d) The department, a county, or a municipality shall not construct or require any railroad to construct an underpass of a plan, specification, or design, the strength of which, in the judgment of the railroad, shall not be sufficient to meet the requirements of its traffic thereover. In a plan providing for an overpass or underpass, the department, a county, or a municipality shall not interfere with or change the grade or alignment of the track or tracks of any railroad or relocate the line of the railroad without its consent.

Ga. Code Ann. § 32-6-194

Blocked Crossings

State Laws, Regulations, and Penalties

  • 46-8-197. Exemption from personal responsibility for train and yard crews blocking crossings under orders

No member of a train crew, yard crew, or engine crew of a railroad common carrier shall be held personally responsible under, or found guilty of violating, any state laws or municipal ordinances regulating or intended to regulate the occupying or blocking of any street, road, or highway grade crossing by engines or passenger or freight cars, upon reasonable proof by the crew member that the occupying or blocking of the grade crossing was necessary to comply with the orders or instructions, either written or oral, of his employer or of the officers or supervisory officials of the company owning the railroad over which the engine or cars are operated; provided, however, that this Code section shall not relieve the employer or railroad company from any responsibility placed upon such employee or railroad company by any such state laws or municipal ordinances.

Ga. Code Ann. § 46-8-197

Warning Devices-Passive

State Laws and Regulations

  • 46-8-194. Erection and maintenance of railroad crossbuck signs; standards for signs

By July 31, 1976, each railroad company shall erect and continue to maintain a reflectorized railroad crossbuck sign at each grade crossing where a railroad crossbuck sign is required by Georgia law to be erected. Such reflectorized railroad crossbuck signs shall conform to standards established by the Georgia Department of Transportation.

Ga. Code Ann. § 46-8-194

  • 40-6-141. All vehicles must stop at certain railroad grade crossings

The Department of Transportation and local authorities with the approval of the department are authorized to designate particularly dangerous highway grade crossings of railroads and to erect stop signs thereat. When such stop signs are erected, the driver of any vehicle shall stop within 50 feet but not less than 15 feet from the nearest rail of such railroad and shall proceed only upon exercising due care.

Ga. Code Ann. § 40-6-141

Warning Devices- Train Borne

State Laws, Regulations, and Penalties

No applicable statute relating to this topic.

Warning Devices- Active

State Laws and Regulations

No applicable statutes relating to this topic.

Private Crossings

State Laws and Regulations

No applicable statute relating to this topic.

Vegetation Clearance

State Laws, Regulations, and Penalties

No applicable statute related to this topic.